Facelift of the Evergreen Mercantile Begins to Take Shape
The facelift of the former BMC Building in Bergen Park is beginning to take shape and will soon completely transform the building into the new Evergreen Mercantile. EVstudio designed the exterior facade remodel and engineered new storefront openings in the existing double "T" wall construction. The new windows have been installed on the second level and the roof framing is almost complete. The structural concrete double "T" construction can still be seen beyond the new roof structure but will soon disappear behind the new storefronts on the new front facade of the building.
EVstudio is currently working on the Tenant Improvement plans for the building as well.
Related Articles:- New Openings in Existing Concrete Double T Wall at Evergreen Mercantile
- Updates on Framing at the Diamond Building on Castle Court in Evergreen
- Setting Trusses at the Diamond Office and Retail Building in Evergreen Colorado
- Evergreen Terraces and EVstudio Architecture Featured in National Real Estate Article for LEED Work
- Montessori School of Evergreen Update
- Trusses Go Up at Kershenstein’s Honka Log Home
- Solar Panels Going up on Evergreen Terraces
- Evergreen Terraces Office Building Open House – See the First LEED Building in Evergreen, Colorado
Leave a Response

Entries(RSS)