New Openings in Existing Concrete Double T Wall at Evergreen Mercantile
On August 18, the removal of the 2" concrete flanges of the concrete double T wall began. EVstudio engineered the front wall to allow for the new openings and provided details to adequately brace the structure with the remaining wall lengths. When construction is completed you won't be able to tell this was once a double T wall building with the typical visible flanges.
Related Articles:- Setting Trusses at the Diamond Office and Retail Building in Evergreen Colorado
- Building Height Restrictions Vary – Always Double Check
- New Trends in Concrete Formwork
- Regional Costs of Concrete by the Cubic Yard
- Updates on Framing at the Diamond Building on Castle Court in Evergreen
- Effect of Overdriven Fasteners on Shear Wall Capacity
- Honka Log Wall Stacking at Kershenstein Residence in Evergreen Colorado
- Evergreen Terraces and EVstudio Architecture Featured in National Real Estate Article for LEED Work
1 Responses »
Leave a Response

Entries(RSS)
We are starting to see many creative ways to redefine existing space. Very cool!