Trusses Go Up at Kershenstein’s Honka Log Home
On Sunday I stopped by the Kershenstein residence to see what progress has taken place. Along with the upper floor framing and upper framed walls, the upper level trusses look to be almost all in place. Also on the lower level, temporary bracing is in place until the stone clad concrete masonry columns are built to support the main level deck above.
Related Articles:- Honka Log Wall Stacking at Kershenstein Residence in Evergreen Colorado
- Honka Showroom Progress at Teepees Office Building in Evergreen
- How Much Does it Cost to Build a Home?
- Stacking Logs on a Log Home in Beulah
- Proper Exterior Column Details Prevent Decay
- Setting Trusses at the Diamond Office and Retail Building in Evergreen Colorado
Leave a Response

Entries(RSS)